/
Recommended velocity should be between 5 ft/s – 7 ft/s
Head Loss (ft) | Operating Cost (USD/hr) | Yearly Savings | ||||
Size (in) | Velocity (ft/s) | Boreline | Steel | Boreline | Steel | (USD) |
1″ | ||||||
1.25″ | ||||||
1.5″ | ||||||
2″ | ||||||
2.5″ | ||||||
3″ | ||||||
4″ | ||||||
5″ | ||||||
6″ | ||||||
8″ |
Sorry but your depth and GPM combination are too much for the Boreline to handle. Please use a smaller GPM or shallower depth setting.