Water is supplied to a ready-mix concrete facility. The water is very aggressive with high iron bacteria and steel pipe usually lasts less than two years. Boreline was installed.
The motor had to be replaced a while later and the 580ft length of 4” Boreline was removed, the motor replaced and the Boreline set back into the well.