Skip to content

This particular Water Utility has very aggressive water. They have used steel pipes in the past but have to continually combat the persistent corrosion problems associated with the aggressive water and steel pipes.

Corrosion is a serious and costly problem. Because of it long life expectancy, Boreline Flexible Drop Pipe was specified for the project resulting in the prevention of any further failures with the drop pipe due to corrosion or on internal scaling.

It also allowed for the project to be completed quickly and safely.

Preparing the pump and motor

Attaching the power cable to the Boreline

Attaching the Boreline to the Pump with the Boreline fittings

Preparing the lifting clamp to install the pump

Raising the pump into place using the lifting clamps

Raising the pump into place using the lifting clamps

Holding the Boreline in place while the other lifting clamp is attached to the hose

Attaching the Boreline to the well head with the Boreline fittings

Lowering the well head into position

This project is complete

Back To Top